Showing posts with label bart. Show all posts
Showing posts with label bart. Show all posts

Thursday, November 12, 2015

Citywide Subway Coming To SF


Fremont bound train; doors are closing

Everyone in the Bay Area can agree—our transportation system needs some work. The SF Board of Supervisors just approved two new measures to remedy the gridlock. The Subway Master Plan will eventually expand BART and Muni throughout the city.
travis wise  flic.kr:p:py8wv4
Travis Wise via Flickr
Most of the Bay Area has no subway access. In fact, San Francisco only has two subways: a short Muni route beneath Market Street and an underground BART line to the Mission and Daly City. An additional tunnel called the Central Subway is under construction and will be completed in 2019. The Subway Master Plan will develop long-term solutions for improving public transportation and offer accessibility to more residents.
Central Subwaysf.com
Courtesy of CentralSubwaySF.com
The Transportation Sustainability Fee was also approved. For the first time ever, property developers will be required to pay transit impact fees. This will generate an estimated $1.3 billion over 30 years by regulating new market-rate housing construction. That adds up to $44 million annually, which will be directly funneled to transportation improvements. TSF proceeds will go toward new vehicles, transit system enhancements, pedestrian safety projects, and regional transit upgrades. It took Supervisor Scott Wiener five years to get the initiatives passed.
Now if only BART ran later than midnight.
[Featured Image: Keoki Seu via Flickr]

Article and images sourced from http://www.upout.com/blog/san-francisco-3/citywide-subway-coming-to-sf?utm_source=facebook&utm_medium=UpOutSF&utm_campaign=freepost

 

Wednesday, June 18, 2014

Huge rope sculpture to be removed from Embarcadero BART

After nearly four decades of hanging around at the Embarcadero BART Station, waving at incoming and outgoing trains, a grimy character so familiar it eventually blended into the walls is retiring.

"Legs," the 50-foot-tall, 7,000-pound rope sculpture that has hung on the east wall of the station since it opened in 1976, will be carefully dismantled, removed from the station and returned to its creator, noted textile artist Barbara Shawcroft, 84, who lives in Davis.

The decommissioning of the public artwork is scheduled to start Friday when BART crews will erect scaffolding. Early next week, workers will dismantle the sculpture using detailed instructions prepared by the artist. By the end of the month, "Legs" will be part of BART's past, much like grungy brown upholstered seats and free parking.


A macrame sculpture titled "Legs" by Barbara
Shawcroft hangs at the east end
of the Embarcadero BART station on
Friday, April 26, 2013 in San Francisco, Calif.



There's some debate over whether the sculpture was installed in 1976 or 1978, but it was commissioned at a time when macrame and burnt orange were popular. While it may have had the appearance of oversized macrame, Shawcroft, a professor emeritus of the UC Davis School of Design, has said it's a Neolithic technique known as knotless netting.

"Legs" hangs through all three levels of the station, and is made of Nomex, a fireproof material. When it was installed, it was a rich orange and white, and it shimmied and swayed when trains sped in and out of the Transbay Tube.

"For me, this piece beautifully represents the time in which it was created," said Molly McArthur, a BART community relations representative who works on public art. "This is the '70s - it was perfect for its time."

But time and grime - particularly the dust from train brakes - took their toll on the sculpture, leaving it so dark and soiled it was scarcely noticeable against the station's gray walls. Over the years, Shawcroft tangled with BART officials who wanted it removed. In 1987, then-Director John Glenn likened it to a "hanging dish towel."

The artist insisted that BART should leave "Legs" dangling and said the agency's contract with her required them to clean the sculpture, something that proved costly and short-lived during three attempts. The standoff led to decades of inaction, with the sculpture seemingly forgotten.

BART budget proceedings last year brought the beginning of the end. The transit system included $300,000 in its budget for the removal of the artwork. Shawcroft initially contested the effort but eventually agreed to work with BART on the decommissioning. She could not be reached for comment for this story.


A macrame sculpture titled "Legs" by Barbara Shawcroft
hangs at the east end of the
Embarcadero BART station on
Friday, April 26, 2013 in San Francisco, Calif.



McArthur said she has worked with Shawcroft and that the artist understands that the grimy environs of a busy subway station aren't the best location for textile art.

"She's actually relieved it's going to be coming out of this environment," McArthur said.

Under the artist's agreement with BART, the sculpture will be removed in pieces, wrapped in plastic and delivered to Shawcroft. BART officials and the artist had looked for a museum to take in "Legs," but its size and condition made the search difficult. The artist is probably going to "repurpose" the sculpture into smaller pieces, she said.

"She is the creator of the work, and her heart still beats for it," McArthur said.

Once "Legs" is gone, all that will remain are memories and photographs. BART doesn't plan to replace the artwork, instead leaving the eastern wall of the station barren so it can be used for maintenance access - and to collect dust.




Article & Photos Sourced from:  http://www.sfgate.com/bayarea/article/Huge-rope-sculpture-to-be-removed-from-5539754.php#photo-6425846